How BIM was Used to Ease the Construction of Abu Dhabi International Airport?

Pragya Sharma

8 min read

March 19, 2023

blog

Table of Contents

The expansion of Abu Dhabi International Airport stands as one of the most complex infrastructure developments in the Middle East. Airports operate at a scale where design coordination, construction sequencing, and stakeholder alignment must function with extreme precision. Any misalignment can lead to delays, safety risks, and cost overruns.

In this project, Building Information Modeling (BIM) played an important role in managing complexity across design, construction, and execution stages. Traditional methods alone were not sufficient to coordinate thousands of building elements, multiple engineering disciplines, and overlapping construction activities.

This article explains how BIM was used in the construction of Abu Dhabi International Airport to improve coordination, construction sequencing, cost efficiency, and overall project delivery.

Design and Planning of the extended Abu Dhabi International Airport

Plan of the Abu Dhabi International Airport

This section explains the planning and design complexities involved in expanding Abu Dhabi International Airport and the need for advanced digital coordination.

The design of the expansion project focused on creating a world-class airport that would cater to the needs of the increasing number of passengers and airlines using the airport. The expansion project added a new terminal building, Midfield Terminal, the largest building in Abu Dhabi and one of the largest airport terminals in the world, covering an area of 700,000 square meters.

The design of Midfield Terminal is based on a concept of a "pearl in the desert", reflecting the cultural heritage and identity of Abu Dhabi. The terminal features a large, curved roof that resembles a shell, while the interior is designed to create a sense of space and openness, with natural light and green spaces.

The terminal also includes state-of-the-art facilities and technologies, including a baggage handling system that can process up to 19,000 bags per hour, over 130 check-in counters, and 165 immigration counters. It also includes a range of retail and dining options, as well as lounges and prayer rooms. In addition to the Midfield Terminal, the expansion project included the construction of a new runway, taxiways, and aircraft parking stands, as well as upgrades to existing facilities.

Read: 10 Awesome BIM Projects Around the World You Can't Miss

Why Airport Construction Is a Complex Engineering Task

Ongoing construction work of Pittsburgh’s new airport

This section outlines the technical, scheduling, safety, and coordination challenges unique to large airport construction projects.

Airports are complex projects that require extensive planning, design, and construction. They involve a wide range of stakeholders, including airport authorities, airlines, government agencies, and the AEC project teams (Architecture, Engineering and Construction). The construction involves multiple disciplines such as civil engineering, architecture, mechanical, electrical and plumbing engineering services (MEP), heating, ventilation and air-conditioning services (HVAC), and landscaping, all of which need to be integrated seamlessly to create a functional and efficient airport. 
Additionally, airports have stringent safety and security requirements that must be met, including compliance with local and international regulations. This requires close collaboration between the different stakeholders to ensure that the airport is designed and built to meet these standards.

Read: BIM for Structural Engineers: Top Benefits, Significance, and Work Opportunities

Moreover, airports are critical infrastructure facilities that have a significant impact on the local and national economies. The construction of airports requires significant investment and funding, and any delays or cost overruns can have far-reaching consequences. Additionally, airports need to be operational around the clock, and construction activities must be carefully planned and coordinated to minimize disruptions to the ongoing airport operations. This requires extensive logistical planning and coordination between the different project management teams, construction teams and the airport management teams to ensure that the construction activities maintain the safety and efficiency of the airport operations. 

Challenges Faced During the Construction of Abu Dhabi International Airport 

Aerial view of the construction work of Abu Dhabi International Airport

This section highlights the major on-ground challenges encountered during construction, setting the context for BIM-enabled problem solving.

The planning and construction of the Abu Dhabi International Airport was a challenging and complex task because it required extensive design and construction expertise. Mentioned below are the key challenges faced during the construction of the Abu Dhabi International Airport.

1. Rigorous schedule 

The construction of the extension had a tight schedule, with a target to complete the project within a specific timeframe. This required a highly efficient construction process, as well as effective management and coordination of the various stakeholders involved.

archi new bottom card

2. Complex Design 

The design of the extension was highly complex, requiring the integration of advanced technologies, such as automated baggage handling systems, energy-efficient lighting and climate control systems, and security systems. This required a high level of technical expertise and an attention to detail.

3. Environmental Considerations

The construction of the extension needed to be carried out in a way that minimized its impact on the surrounding environment. This required the implementation of various sustainability measures, such as the use of renewable energy sources, water conservation measures, and waste management practices.

4. Safety

The construction of the extension posed several safety risks, such as working at a considerable height, handling hazardous materials, and the use of heavy machinery. This required the implementation of strict safety protocols and measures to ensure the safety of workers and visitors.

5. Coordination and Collaboration

Owing to the large scale of the project, it involved the collaboration of various AEC stakeholders, such as architects, engineers, contractors, suppliers, and airport authorities. Each stakeholder had a unique role and responsibility, and effective coordination was essential to ensure that the project was completed successfully.

 

How BIM Technology Helped the Construction of Abu Dhabi International Airport

A proposed interior view of the Abu Dhabi International Airport

This section explains how BIM tools and workflows addressed design coordination, sequencing, and communication challenges during construction.

BIM technology provided a comprehensive digital model of the project, enabling the construction team to visualize how different systems and components would fit together. Below are the key ways in which the BIM process helped the construction of the Abu Dhabi International Airport.

1. Clash Detection

Creating BIM models allowed the design and construction teams to identify potential clashes between different building systems and components. By identifying these clashes early on, the project teams were able to resolve them even before construction began, reducing the risk of delays and costly rework. For example, the BIM process helped identify clashes between the airport's electrical systems and other building components, enabling the team to make necessary changes to prevent potential issues.

2. Coordination of Complex Systems

The extension of the Abu Dhabi International Airport involved the integration of multiple complex entities including the mechanical, electrical, and plumbing systems. BIM helped the construction team coordinate these effectively by creating a detailed digital BIM model of the project. This allowed the team to visualize how different systems and components would fit together, identifying potential design and construction issues and conflicts before construction began.

3. Improved Communication and Collaboration 

Implementing a BIM process provided a single platform for all stakeholders to access and work with the same project data. This improved communication and collaboration between different teams, including architects, engineers, contractors, and project owners. By improving collaboration, BIM helped reduce the risk of errors, conflicts, and delays. For example, BIM technology enabled the airport's project management team to access real-time updates on construction progress and identify potential issues, allowing them to take corrective action quickly.

4. Enhanced Construction Sequencing

BIM technology helped the construction team plan and optimize the construction sequence by creating a detailed digital model of the project. This allowed the team to visualize the construction sequence and identify potential issues. By optimizing the construction sequence, BIM helped the team use resources more efficiently, reducing the risk of delays and errors.

5. Cost Savings

By improving coordination, communication, and sequencing, the BIM process helped the construction team reduce the risk of errors, conflicts, and delays, ultimately leading to cost savings. For example, by identifying and resolving potential clashes and conflicts before construction began, BIM helped prevent costly rework and delays.

Conclusion 

The successful implementation of BIM technology in the construction of Abu Dhabi International Airport serves as an example of the potential benefits of this technology in complex construction projects. As BIM technology continues to evolve and become more widely adopted in the industry, it is likely that it will play an increasingly crucial role in the construction of modern infrastructure projects.

If you want to master BIM tech, Novatr brings you an industry-relevant BIM Professional Course. By enrolling for the course, you can master 15+ BIM software and industry workflows, learn from industry stalwarts, and work on a capstone project to hone your skills. Check out the course today!

FAQs

1. What BIM tools were used in the Abu Dhabi International Airport project?

BIM tools were used for multidisciplinary coordination, construction sequencing, and clash detection. These platforms enabled teams to integrate architectural, structural, and services models while maintaining accurate project data throughout the construction lifecycle.

2. How was clash detection handled using BIM in the project?

Clash detection was carried out using coordinated BIM models that identified conflicts between structural, mechanical, electrical, and plumbing systems early. This reduced on-site rework, improved sequencing accuracy, and helped teams resolve issues before construction activities began.

3. How did BIM improve coordination and construction sequencing?

BIM enabled visual planning of construction phases by linking 3D models with schedules. This helped teams align tasks, manage resources efficiently, and reduce disruptions while working within an active airport environment.

4. Did BIM help reduce costs in the Abu Dhabi Airport project?

Yes, BIM reduced costs by minimizing design conflicts, avoiding rework, and improving construction planning. Early issue detection and optimized sequencing helped control delays, material waste, and unplanned expenditure across project stages.

5. Can BIM support future airport expansions?

BIM models can be updated and reused to support future expansions, renovations, and maintenance planning. They provide accurate digital records that help airport authorities make informed decisions over the asset’s operational lifecycle.